- Home
- Departments
- Neighborhood & Community Planning
- Planning Services
- Platting & Subdivisions
- Stormwater Connection Fee Process
Stormwater Connection Fee Process
City of New Braunfels Code of Ordinance Section 143-20 provides provisions for Stormwater Connection Fee and the eligibility of developments to apply for such. Stormwater Connection Fees are a mitigation option to eligible properties with access to stormwater systems with capacity for additional connection(s). The eligibility of each property and development is the responsibility of the owner/developer to research and illustrate. Approval of a SWC Eligibility application does not authorize or guarantee approval of Stormwater Connection Fee Application, required at time of permit. A 3,000’ downstream model is required by code prior to approval of the fee at time of construction permitting. The development must demonstrate system capacity and be in the best interests of the City in order to be approved.
-
Engineering Division
Physical Address
550 Landa Street
New Braunfels, TX 78130
Phone: (830) 221-4275
Quick Links
-
Stormwater Connection Eligibility Form
Requirements for Stormwater Connections are defined in the City of New Braunfels Code of Ordinances Section 143-20.
-
Stormwater Connection Fee Form
Complete Stormwater Connection Fee Form as specified in City of New Braunfels Code of Ordinances Section 143‐20.
-
Online Permit Portal
Use this online tool to submit applications for building permits.
Step By Step Instructions
Step 1: Applicant submits the completed and signed Stormwater Connection Eligibility Form along with a Stormwater Report with downstream analysis via the Permitting Portal.
Step 2: Staff conducts a completeness review, fees are attributed to the SWC and are due via the Permitting Portal prior to staff review. Once payment is made notice to staff is required.
Step 3: Staff reviews and returns determination of eligibility to applicant. If a Stormwater Connection Eligibility is approved, the SWC Approval shall be included in the LOC and/or Permit submittal.
Step 4: At time of permitting, applicant submits the SWC Approval along with permitting documents including a Type 3 Drainage Report with 3000-foot downstream model adhering to requirements of City of New Braunfels Code of Ordinance Section 143-20 and the City’s Drainage and Erosion Control Design Manual via the Permitting Portal.
Step 5: If capacity of the system is verified and the Stormwater Connection Fee is in the best interests of the City, Staff will approve and authorize the Stormwater Connection Fee and verify the fee for the project per City of New Braunfels Code of Ordinance Section 143-20.
Step 6: Fees will be attributed to the permit and are due prior to permit issuance.